ITAC Assessment: MA0354
ITAC logo
ITAC Assessment: MA0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Gaskets
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 75,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,247 533,998
kWh
Electricity Demand $29,220 3,444
kW-mo/yr
Natural Gas $8,002 1,905
MMBtu
Fuel Oil #2 $43,164 9,782
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.7231: Use radiant heater for spot heating $23,668 $72,000 - - $(-12,505.0)
-
MMBtu
$36,173
-
MMBtu
-
02 2.3192: Use fossil fuel powered generator during peak demand periods $2,604 $5,000 $1,233
18,171
kWh
$2,861
-
kW-mo/yr
- $(-1,490.0)
-
MMBtu
-
03 2.2511: Insulate bare equipment $2,340 $4,335 $2,340
34,584
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $613 $200 $613
11,723
kWh
- - - -
05 3.5217: Reuse / recycle/ sell paper products $495 - - - - - $495
-
lb
06 2.7135: Install occupancy sensors $472 $770 $472
7,034
kWh
- - - -
07 2.4221: Install compressor air intakes in coolest locations $416 $312 $416
6,155
kWh
- - - -
TOTAL RECOMMENDED $30,608 $82,617 $5,074
77,667
kWh
$2,861
-
kW-mo/yr
$(-12,505.0)
-
MMBtu
$34,683
-
MMBtu
$495
-
lb
TOTAL IMPLEMENTED $24,281 $72,200 $613
11,723
kWh
- $(-12,505.0)
-
MMBtu
$36,173
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs