Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,848

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0206 #07 Y:2000 Reschedule plant operations or reduce load to avoid peaks $1,568 -
NC0206 #06 Y:2000 Insulate bare equipment $307 $65
NC0206 #05 Y:2000 Utilize higher efficiency lamps and/or ballasts $7,083 $32,849
NC0206 #04 Y:2000 Eliminate or reduce compressed air usage $204 $525
NC0206 #03 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $589 $270
NC0206 #02 Y:2000 Recover waste heat from equipment $2,202 $2,000
NC0206 #01 Y:2000 Reduce the pressure of compressed air to the minimum required $373 $100
MS0176 #08 Y:2000 Pay bills on time to avoid late fees $9,033 $25
MS0176 #07 Y:2000 Burn waste oil for heat $3,044 $3,074
MS0176 #06 Y:2000 Optimize plant power factor $12,504 $18,000
MS0176 #05 Y:2000 Use computer programs to optimize hvac performance $292 $591
MS0176 #04 Y:2000 Install compressor air intakes in coolest locations $633 $888
MS0176 #03 Y:2000 Improve air circulation with destratification fans / other methods $4,687 $6,580
MS0176 #02 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $5,454 $9,024
MS0176 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $14,770 $20,746
LL0102 #05 Y:2000 Reduce scrap production $1,349 -
LL0102 #04 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,140 $2,890
LL0102 #03 Y:2000 Optimize plant power factor $1,262 $1,200
LL0102 #02 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $655 $3,697
LL0102 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $672 $2,135