ITAC Assessment: NC0206
ITAC logo
ITAC Assessment: NC0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,127 1,656,194
kWh
Electricity Demand $44,230 4,397
kW-mo/yr
Electricity Fees $3,559 -
Natural Gas $17,179 2,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $373 $100 $220
8,091
kWh
$153
-
kW-mo/yr
- - - -
02 2.2437: Recover waste heat from equipment $2,202 $2,000 - - - $2,202
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $589 $270 $348
12,792
kWh
$241
-
kW-mo/yr
- - - -
04 2.4239: Eliminate or reduce compressed air usage $204 $525 $72
2,633
kWh
$132
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,083 $32,849 $3,842
141,244
kWh
$3,241
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $307 $65 - - - $307
-
MMBtu
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,568 - - $1,413
-
kW-mo/yr
$155 - - -
08 2.5194: Redesign process $9,810 $40,000 $1,366
50,208
kWh
$944
-
kW-mo/yr
- - $5,000 $2,500
09 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,200 $2,500 - - - $1,300
-
MMBtu
- $(-100.0)
10 2.7241: Install outside air damper / economizer on hvac unit $3,210 $6,000 $3,210
118,000
kWh
- - - - -
TOTAL RECOMMENDED $26,546 $84,309 $9,058
332,968
kWh
$6,124
-
kW-mo/yr
$155 $3,809
-
MMBtu
$5,000 $2,400
TOTAL IMPLEMENTED $10,603 $40,795 $1,786
65,633
kWh
$1,317
-
kW-mo/yr
- - $5,000 $2,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs