Assessment Year | 2019 |
---|---|
Principal Product | Custom Frame Manufacturing |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
60,000
ft2
|
Annual Production | 200,000
units
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $73,514 | 2,612,400 |
kWh
|
$0.028 | |
Electricity Demand | $106,357 | 6,213 |
kW-mo/yr
|
$17.12 | |
Electricity Fees | $7,019 | - |
|
- | |
Natural Gas | $17,453 | 2,655 |
MMBtu
|
$6.57 | |
Waste Disposal Costs | |||||
Water Usage | $4,405 | 1,607 |
Tgal
|
$2.74 | |
Water Disposal | $13,777 | 1,607 |
Tgal
|
$8.58 | |
Other Liquid (non-haz) | $1,682 | 1 |
gal
|
$1,682.00 | |
TOTAL YEARLY COSTS | $224,207 | ||||
RECOMMENDED SAVINGS* | $59,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $642 | $2,510 |
$211
7,543
kWh
|
$431
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,217 | $1,100 |
$464
16,579
kWh
|
$753
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $394 | - |
$127
4,526
kWh
|
$267
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,233 | $8,100 |
$5,252
187,575
kWh
|
$6,981
-
kW-mo/yr
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $8,187 | - |
$3,362
120,085
kWh
|
$4,825
-
kW-mo/yr
|
- | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $4,746 | $1,370 | - | - | - | $4,746 | |
07 | 2.7124: Make a practice of turning off lights when not needed | $150 | - |
$150
5,346
kWh
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $145 | $80 |
$59
2,122
kWh
|
$86
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,556 | $21,155 |
$7,324
261,571
kWh
|
$10,232
-
kW-mo/yr
|
- | - | |
10 | 2.3212: Optimize plant power factor | $14,446 | $12,425 | - | - | $14,446 | - | |
TOTAL RECOMMENDED | $59,716 | $46,740 |
$16,949
605,347
kWh
|
$23,575
-
kW-mo/yr
|
$14,446 | $4,746 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs