ITAC Assessment: UK1914
ITAC logo
ITAC Assessment: UK1914
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Custom Frame Manufacturing
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 60,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 5,304
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,514 2,612,400
kWh
Electricity Demand $106,357 6,213
kW-mo/yr
Electricity Fees $7,019 -
Natural Gas $17,453 2,655
MMBtu
Waste Disposal Costs
Water Usage $4,405 1,607
Tgal
Water Disposal $13,777 1,607
Tgal
Other Liquid (non-haz) $1,682 1
gal
TOTAL YEARLY COSTS $224,207
RECOMMENDED SAVINGS* $59,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $642 $2,510 $211
7,543
kWh
$431
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $1,217 $1,100 $464
16,579
kWh
$753
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $394 - $127
4,526
kWh
$267
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,233 $8,100 $5,252
187,575
kWh
$6,981
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $8,187 - $3,362
120,085
kWh
$4,825
-
kW-mo/yr
- -
06 3.4116: Meter recycled water (to reduce sewer charges) $4,746 $1,370 - - - $4,746
07 2.7124: Make a practice of turning off lights when not needed $150 - $150
5,346
kWh
- - -
08 2.7111: Reduce illumination to minimum necessary levels $145 $80 $59
2,122
kWh
$86
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $17,556 $21,155 $7,324
261,571
kWh
$10,232
-
kW-mo/yr
- -
10 2.3212: Optimize plant power factor $14,446 $12,425 - - $14,446 -
TOTAL RECOMMENDED $59,716 $46,740 $16,949
605,347
kWh
$23,575
-
kW-mo/yr
$14,446 $4,746
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs