Assessment Year | 2003 |
---|---|
Principal Product | Air and gas compressors |
NAICS | 333912: Air and Gas Compressor Manufacturing |
SIC | 3563: Air and Gas Compressors |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
250,000
ft2
|
Annual Production | 1,211
pieces
|
Production Hrs. Annual | 2,805
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,862 | 3,765,538 |
kWh
|
$0.026 |
Electricity Demand | $195,138 | 13,896 |
kW-mo/yr
|
$14.04 |
Natural Gas | $154,845 | 19,164 |
MMBtu
|
$8.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,260 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,965 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $40,625 | - | - |
$40,625
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,440 | $4,000 |
$1,900
350,625
kWh
|
$19,400
-
kW-mo/yr
|
- | $(-860.0) | $1,000 | |
03 | 4.431: Train operators for maximum operating efficiency | $9,450 | - | - | - | - | $9,450 | - | |
04 | 2.7131: Add area lighting switches | $5,855 | $1,900 |
$1,820
72,930
kWh
|
$4,035
-
kW-mo/yr
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $3,880 | - | - |
$3,880
-
kW-mo/yr
|
- | - | - | |
06 | 2.7229: Air condition only space necessary | $4,540 | - |
$250
9,659
kWh
|
$700
-
kW-mo/yr
|
$3,590
-
MMBtu
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $3,020 | - |
$3,020
116,150
kWh
|
- | - | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $2,970 | $420 |
$950
36,465
kWh
|
$2,020
-
kW-mo/yr
|
- | - | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $1,480 | $2,730 | - | - |
$1,480
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $93,260 | $9,050 |
$7,940
585,829
kWh
|
$70,660
-
kW-mo/yr
|
$5,070
-
MMBtu
|
$8,590 | $1,000 | ||
TOTAL IMPLEMENTED | $65,965 | $3,150 |
$4,220
162,274
kWh
|
$47,225
-
kW-mo/yr
|
$5,070
-
MMBtu
|
$9,450 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs