Assessment Year | 2001 |
---|---|
Principal Product | Pipe Spacers and Insulators |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
37,500
ft2
|
Annual Production | 14
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $9,691 | 223,916 |
kWh
|
$0.043 |
Electricity Demand | $5,665 | 1,008 |
kW-mo/yr
|
$5.62 |
Electricity Fees | $1,129 | - |
|
- |
Natural Gas | $7,041 | 800 |
MMBtu
|
$8.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,078 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,406 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $672 | $2,135 |
$388
9,132
kWh
|
$258
-
kW-mo/yr
|
$26 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $655 | $3,697 |
$630
14,812
kWh
|
- | $25 | - | |
03 | 2.3212: Optimize plant power factor | $1,262 | $1,200 | - |
$1,262
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,140 | $2,890 |
$712
16,737
kWh
|
$384
-
kW-mo/yr
|
$44 | - | |
05 | 3.1192: Reduce scrap production | $1,349 | - | - | - | - |
$1,349
-
lb
|
|
TOTAL RECOMMENDED | $5,078 | $9,922 |
$1,730
40,681
kWh
|
$1,904
-
kW-mo/yr
|
$95 |
$1,349
-
lb
|
||
TOTAL IMPLEMENTED | $4,406 | $7,787 |
$1,342
31,549
kWh
|
$1,646
-
kW-mo/yr
|
$69 |
$1,349
-
lb
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs