ITAC Assessment: LL0102
ITAC logo
ITAC Assessment: LL0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Pipe Spacers and Insulators
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 37,500
ft2
Annual Production 14
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,691 223,916
kWh
Electricity Demand $5,665 1,008
kW-mo/yr
Electricity Fees $1,129 -
Natural Gas $7,041 800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $672 $2,135 $388
9,132
kWh
$258
-
kW-mo/yr
$26 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $655 $3,697 $630
14,812
kWh
- $25 -
03 2.3212: Optimize plant power factor $1,262 $1,200 - $1,262
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,140 $2,890 $712
16,737
kWh
$384
-
kW-mo/yr
$44 -
05 3.1192: Reduce scrap production $1,349 - - - - $1,349
-
lb
TOTAL RECOMMENDED $5,078 $9,922 $1,730
40,681
kWh
$1,904
-
kW-mo/yr
$95 $1,349
-
lb
TOTAL IMPLEMENTED $4,406 $7,787 $1,342
31,549
kWh
$1,646
-
kW-mo/yr
$69 $1,349
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs