ITAC Assessment: MS0176
ITAC logo
ITAC Assessment: MS0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic Battery Components
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 150,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $630,882 19,315,200
kWh
Electricity Demand $366,710 37,315
kW-mo/yr
Electricity Fees $15,172 -
Natural Gas $34,153 6,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,770 $20,746 $8,791
269,569
kWh
$5,761
-
kW-mo/yr
$218 - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,454 $9,024 $5,373
164,779
kWh
- $81 - - -
03 2.7243: Improve air circulation with destratification fans / other methods $4,687 $6,580 $2,946
90,349
kWh
- $45 $1,696
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $633 $888 $588
18,027
kWh
$36
-
kW-mo/yr
$9 - - -
05 2.7226: Use computer programs to optimize hvac performance $292 $591 $288
8,822
kWh
- $4 - - -
06 2.3212: Optimize plant power factor $12,504 $18,000 - - $12,504 - - -
07 3.6124: Burn waste oil for heat $3,044 $3,074 - - - $1,762
-
MMBtu
- $1,282
-
gal
08 4.821: Pay bills on time to avoid late fees $9,033 $25 - - - - $9,033
-
Tgal
-
TOTAL RECOMMENDED $50,417 $58,928 $17,986
551,546
kWh
$5,797
-
kW-mo/yr
$12,861 $3,458
-
MMBtu
$9,033
-
Tgal
$1,282
-
gal
TOTAL IMPLEMENTED $22,170 $18,913 $588
18,027
kWh
$36
-
kW-mo/yr
$12,513 - $9,033
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs