Assessment Year | 2001 |
---|---|
Principal Product | Plastic Battery Components |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
150,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $630,882 | 19,315,200 |
kWh
|
$0.033 |
Electricity Demand | $366,710 | 37,315 |
kW-mo/yr
|
$9.83 |
Electricity Fees | $15,172 | - |
|
- |
Natural Gas | $34,153 | 6,189 |
MMBtu
|
$5.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,417 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,170 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,770 | $20,746 |
$8,791
269,569
kWh
|
$5,761
-
kW-mo/yr
|
$218 | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,454 | $9,024 |
$5,373
164,779
kWh
|
- | $81 | - | - | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $4,687 | $6,580 |
$2,946
90,349
kWh
|
- | $45 |
$1,696
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $633 | $888 |
$588
18,027
kWh
|
$36
-
kW-mo/yr
|
$9 | - | - | - | |
05 | 2.7226: Use computer programs to optimize hvac performance | $292 | $591 |
$288
8,822
kWh
|
- | $4 | - | - | - | |
06 | 2.3212: Optimize plant power factor | $12,504 | $18,000 | - | - | $12,504 | - | - | - | |
07 | 3.6124: Burn waste oil for heat | $3,044 | $3,074 | - | - | - |
$1,762
-
MMBtu
|
- |
$1,282
-
gal
|
|
08 | 4.821: Pay bills on time to avoid late fees | $9,033 | $25 | - | - | - | - |
$9,033
-
Tgal
|
- | |
TOTAL RECOMMENDED | $50,417 | $58,928 |
$17,986
551,546
kWh
|
$5,797
-
kW-mo/yr
|
$12,861 |
$3,458
-
MMBtu
|
$9,033
-
Tgal
|
$1,282
-
gal
|
||
TOTAL IMPLEMENTED | $22,170 | $18,913 |
$588
18,027
kWh
|
$36
-
kW-mo/yr
|
$12,513 | - |
$9,033
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs