ITAC Assessment: NC0359
ITAC logo
ITAC Assessment: NC0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Gas fired space heaters
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 150,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,188 3,429,939
kWh
Electricity Fees $36,902 -
Natural Gas $157,898 12,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,084

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $3,715 $41,600 $(-1,043.0)
(-22,917)
kWh
$4,758
-
MMBtu
- -
02 2.4151: Develop a repair/replace policy $496 $610 $496
10,908
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,232 $100 $2,132
46,869
kWh
- $(-600.0) $(-300.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $356 $718 $356
7,818
kWh
- - -
TOTAL RECOMMENDED $5,799 $43,028 $1,941
42,678
kWh
$4,758
-
MMBtu
$(-600.0) $(-300.0)
TOTAL IMPLEMENTED $2,084 $1,428 $2,984
65,595
kWh
- $(-600.0) $(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs