ITAC Assessment: AR0052
ITAC logo
ITAC Assessment: AR0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Gas & Radiator Caps, Rollover Gas Valves
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 240,000
ft2
Annual Production 42,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $652,491 12,508,207
kWh
Natural Gas $36,360 7,811
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,267

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $4,158 $3,900 $4,158
87,632
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,056 $3,029 $13,056
216,882
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,407 $200 $6,407
137,456
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,623 $19,409 $10,623
187,573
kWh
05 2.3212: Optimize plant power factor $15,249 $8,760 $15,249
-
kWh
06 2.2511: Insulate bare equipment $6,452 $770 $6,452
123,681
kWh
07 2.4239: Eliminate or reduce compressed air usage $9,786 $1,500 $9,786
209,848
kWh
08 2.7111: Reduce illumination to minimum necessary levels $6,774 $8,835 $6,774
129,543
kWh
TOTAL RECOMMENDED $72,505 $46,403 $72,505
1,092,615
kWh
TOTAL IMPLEMENTED $56,267 $44,133 $56,267
759,086
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs