ITAC Assessment: MS0046
ITAC logo
ITAC Assessment: MS0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 164
Plant Area 93,000
ft2
Annual Production 32,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,058 10,901,524
kWh
Electricity Demand $156,976 28,909
kW-mo/yr
Electricity Fees $183,347 -
Natural Gas $421,181 174,793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $645 $1,502 $394
23,447
kWh
$251 - -
02 2.4221: Install compressor air intakes in coolest locations $632 $110 $386
23,154
kWh
$246 - -
03 2.2414: Use waste heat from hot flue gases to preheat $73,061 $33,000 - - $73,061
-
MMBtu
-
04 3.5315: Lease / purchase baler; sell cardboard to recycler $20,040 $31,500 - - - $20,040
-
lb
05 3.5216: Recycle nonferrous dust $510 - - - - $510
-
lb
TOTAL RECOMMENDED $94,888 $66,112 $780
46,601
kWh
$497 $73,061
-
MMBtu
$20,550
-
lb
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs