ITAC Assessment: AS0192
ITAC logo
ITAC Assessment: AS0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Airbag Ignitors
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 150,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,871 4,337,632
kWh
Electricity Demand $17,111 8,053
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7232: Replace existing hvac unit with high efficiency model $723 $3,150 $616
12,309
kWh
$107
-
kW-mo/yr
-
02 2.7261: Install timers and/or thermostats $617 $1,440 $617
12,309
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,975 - $2,975
58,910
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,488 $340 $5,855
116,061
kWh
$633
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $642 $1,548 $598
11,723
kWh
$44
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,503 $450 $1,503
29,894
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $13,389 $23,683 $12,159
240,621
kWh
$1,230
-
kW-mo/yr
-
08 3.5213: Reuse scrap printed paper for make-ready $1,620 - - - $1,620
-
lb
TOTAL RECOMMENDED $27,957 $30,611 $24,323
481,827
kWh
$2,014
-
kW-mo/yr
$1,620
-
lb
TOTAL IMPLEMENTED $22,220 $27,173 $18,630
368,991
kWh
$1,970
-
kW-mo/yr
$1,620
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs