Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0318 #01 Y:1997 Shift from daytime to nighttime operation $89,367 -
SD0193 #10 Y:1997 Optimize production lot sizes and inventories $16,000 $4,000
SD0193 #09 Y:1997 Eliminate old stock and modify inventory control $3,200 $3,000
SD0193 #08 Y:1997 Optimize production lot sizes and inventories $16,000 $10,000
SD0193 #07 Y:1997 Recover and reuse waste material $687 -
SD0193 #06 Y:1997 Lease / purchase baler; sell cardboard to recycler $10,800 $5,000
SD0193 #05 Y:1997 Install spectral reflectors / delamp $1,914 $3,160
SD0193 #04 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,411 $4,495
SD0193 #03 Y:1997 Reduce the pressure of compressed air to the minimum required $1,481 -
SD0193 #02 Y:1997 Install timers and/or thermostats $2,078 $1,500
SD0193 #01 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $2,848 $2,848
NC0134 #09 Y:1997 Clear and rent existing space $30,000 $26,980
NC0134 #08 Y:1997 Add equipment/ operators to reduce production bottleneck $20,000 $10,000
NC0134 #07 Y:1997 Utilize higher efficiency lamps and/or ballasts $3,598 $6,669
NC0134 #06 Y:1997 Recover waste heat from equipment $1,413 $1,000
NC0134 #05 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $142 $300
NC0134 #04 Y:1997 Analyze flue gas for proper air/fuel ratio $3,793 $700
NC0134 #03 Y:1997 Use / purchase optimum sized compressor $5,986 $1,000
NC0134 #02 Y:1997 Convert from indirect to direct fired systems $13,767 $61,000
NC0134 #01 Y:1997 Burn a less expensive grade of fuel $17,025 $30,000