| Assessment Year | 1998 |
|---|---|
| Principal Product | Bedspreads and Bed sets |
| NAICS |
n/a
|
| SIC | 2392: House furnishing, Except Curtains and Draperies |
| Sales Range | $10 M to 50M |
| # of Employees | 380 |
| Plant Area |
175,000
ft2
|
| Annual Production | 12,500,000
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,609 | 1,258,206 |
kWh
|
$0.069 |
| Electricity Demand | $25,727 | 3,142 |
kW-mo/yr
|
$8.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,860 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,848 | $2,848 |
$2,100
30,481
kWh
|
$748
-
kW-mo/yr
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $2,078 | $1,500 |
$2,078
30,188
kWh
|
- | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,481 | - |
$1,092
15,826
kWh
|
$389
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,411 | $4,495 |
$887
12,896
kWh
|
$524
-
kW-mo/yr
|
- | - | |
| 05 | 2.7144: Install spectral reflectors / delamp | $1,914 | $3,160 |
$1,203
17,585
kWh
|
$711
-
kW-mo/yr
|
- | - | |
| 06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $10,800 | $5,000 | - | - |
$10,800
-
lb
|
- | |
| 07 | 3.5311: Recover and reuse waste material | $687 | - | - | - |
$687
-
lb
|
- | |
| 08 | 4.321: Optimize production lot sizes and inventories | $16,000 | $10,000 | - | - | - | $16,000 | |
| 09 | 4.322: Eliminate old stock and modify inventory control | $3,200 | $3,000 | - | - | - | $3,200 | |
| 10 | 4.321: Optimize production lot sizes and inventories | $16,000 | $4,000 | - | - | - | $16,000 | |
| TOTAL RECOMMENDED | $56,419 | $34,003 |
$7,360
106,976
kWh
|
$2,372
-
kW-mo/yr
|
$11,487
-
lb
|
$35,200 | ||
| TOTAL IMPLEMENTED | $36,860 | $28,503 |
$4,190
60,962
kWh
|
$1,983
-
kW-mo/yr
|
$11,487
-
lb
|
$19,200 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs