ITAC Assessment: NC0134
ITAC logo
ITAC Assessment: NC0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wooden furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,513 1,456,038
kWh
Electricity Demand $34,840 8,710
kW-mo/yr
Electricity Fees $3,298 -
Fuel Oil #2 $22,025 5,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,724 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.1331: Burn a less expensive grade of fuel $17,025 $30,000 - - $22,025
-
MMBtu
$(-5,000.0)
-
MMBtu
- - -
02 2.5111: Convert from indirect to direct fired systems $13,767 $61,000 $9,495
211,020
kWh
$4,272
-
kW-mo/yr
- - - - -
03 2.4226: Use / purchase optimum sized compressor $5,986 $1,000 $3,903
86,753
kWh
$2,083
-
kW-mo/yr
- - - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,793 $700 - - $3,793
-
MMBtu
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $142 $300 $92
2,052
kWh
$50
-
kW-mo/yr
- - - - -
06 2.2437: Recover waste heat from equipment $1,413 $1,000 - - $1,413
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,598 $6,669 $1,258
27,843
kWh
$672
-
kW-mo/yr
- - $1,103 $565 -
08 4.111: Add equipment/ operators to reduce production bottleneck $20,000 $10,000 - - - - $20,000 - -
09 4.521: Clear and rent existing space $30,000 $26,980 - - - - - - $30,000
TOTAL RECOMMENDED $95,724 $137,649 $14,748
327,668
kWh
$7,077
-
kW-mo/yr
$27,231
-
MMBtu
$(-5,000.0)
-
MMBtu
$21,103 $565 $30,000
TOTAL IMPLEMENTED $80,544 $75,649 $5,253
116,648
kWh
$2,805
-
kW-mo/yr
$25,818
-
MMBtu
$(-5,000.0)
-
MMBtu
$21,103 $565 $30,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs