Assessment Year | 1998 |
---|---|
Principal Product | Wooden furniture |
NAICS |
n/a
|
SIC | 2512: Wood Household Furniture, Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
100,000
ft2
|
Annual Production | 25,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,513 | 1,456,038 |
kWh
|
$0.045 |
Electricity Demand | $34,840 | 8,710 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $3,298 | - |
|
- |
Fuel Oil #2 | $22,025 | 5,765 |
MMBtu
|
$3.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $95,724 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $80,544 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Wood Savings | Personnel Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $17,025 | $30,000 | - | - |
$22,025
-
MMBtu
|
$(-5,000.0)
-
MMBtu
|
- | - | - | |
02 | 2.5111: Convert from indirect to direct fired systems | $13,767 | $61,000 |
$9,495
211,020
kWh
|
$4,272
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $5,986 | $1,000 |
$3,903
86,753
kWh
|
$2,083
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,793 | $700 | - | - |
$3,793
-
MMBtu
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $142 | $300 |
$92
2,052
kWh
|
$50
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $1,413 | $1,000 | - | - |
$1,413
-
MMBtu
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,598 | $6,669 |
$1,258
27,843
kWh
|
$672
-
kW-mo/yr
|
- | - | $1,103 | $565 | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $20,000 | $10,000 | - | - | - | - | $20,000 | - | - | |
09 | 4.521: Clear and rent existing space | $30,000 | $26,980 | - | - | - | - | - | - | $30,000 | |
TOTAL RECOMMENDED | $95,724 | $137,649 |
$14,748
327,668
kWh
|
$7,077
-
kW-mo/yr
|
$27,231
-
MMBtu
|
$(-5,000.0)
-
MMBtu
|
$21,103 | $565 | $30,000 | ||
TOTAL IMPLEMENTED | $80,544 | $75,649 |
$5,253
116,648
kWh
|
$2,805
-
kW-mo/yr
|
$25,818
-
MMBtu
|
$(-5,000.0)
-
MMBtu
|
$21,103 | $565 | $30,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Wood Savings | Personnel Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs