Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,700

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0517 #05 Y:2021 Use cooling tower or economizer to replace chiller cooling $7,886 $28,000
LE0517 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,795 $12,000
LE0517 #03 Y:2021 Replace existing chiller with high efficiency model $52,000 $100,000
LE0517 #02 Y:2021 Utilize energy-efficient belts and other improved mechanisms $1,255 $400
LE0517 #01 Y:2021 Reduce the pressure of compressed air to the minimum required $603 $40
LS0122 #05 Y:2021 Use optimum thickness insulation $2,779 $6,297
LS0122 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $46,495 $39,219
LS0122 #03 Y:2021 Install occupancy sensors $1,436 $575
LS0122 #02 Y:2021 Utilize daylight whenever possible in lieu of artificial light $942 $300
LS0122 #01 Y:2021 Clean and maintain refrigerant condensers and towers $13,696 -
SF0581 #10 Y:2021 Utilize higher efficiency lamps and/or ballasts $26,991 $61,830
SF0581 #09 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $17,582 $23,946
SF0581 #08 Y:2021 Utilize energy-efficient belts and other improved mechanisms $202 $192
SF0581 #07 Y:2021 Repair and eliminate steam leaks $2,960 $2,345
SF0581 #06 Y:2021 Reduce space conditioning during non-working hours $2,550 $1,334
SF0581 #05 Y:2021 Insulate bare equipment $7,711 $3,227
SF0581 #04 Y:2021 Remove or close off unneeded compressed air lines $5,523 $1,537
SF0581 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $3,255 $300
SF0581 #02 Y:2021 Analyze flue gas for proper air/fuel ratio $488 -
SF0581 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $17,942 -