Assessment Year | 2022 |
---|---|
Principal Product | Recycled Plastic Pellets |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3082: Unsupported Plastics Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
60,000
ft2
|
Annual Production | 16,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $271,150 | 5,337,600 |
kWh
|
$0.051 |
Electricity Demand | $31,652 | 12,427 |
kW-mo/yr
|
$2.55 |
Electricity Fees | $10,129 | - |
|
- |
TOTAL YEARLY COSTS | $312,931 | |||
RECOMMENDED SAVINGS* | $66,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,728 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $603 | $40 |
$565
11,072
kWh
|
$38
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,255 | $400 |
$1,173
23,001
kWh
|
$82
-
kW-mo/yr
|
- | |
03 | 2.2622: Replace existing chiller with high efficiency model | $52,000 | $100,000 | - | - | $52,000 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,795 | $12,000 |
$4,489
88,031
kWh
|
$306
-
kW-mo/yr
|
- | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,886 | $28,000 |
$7,379
144,678
kWh
|
$507
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $125 | $480 |
$69
1,360
kWh
|
$56
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $66,664 | $140,920 |
$13,675
268,142
kWh
|
$989
-
kW-mo/yr
|
$52,000 | ||
TOTAL IMPLEMENTED | $52,728 | $100,520 |
$634
12,432
kWh
|
$94
-
kW-mo/yr
|
$52,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs