ITAC Assessment: SF0581
ITAC logo
ITAC Assessment: SF0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Dried figs, raisins, paste and concentrate
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 645,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,658 1,877,280
kWh
Natural Gas $99,484 15,860
MMBtu
Waste Disposal Costs
Water Usage $39,056 16,061
Tgal
Water Disposal $30,608 12,551
Tgal
TOTAL YEARLY COSTS $457,806
RECOMMENDED SAVINGS* $85,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,942 - $19,142
59,687
kWh
- $(-1,200.0) -
02 2.1233: Analyze flue gas for proper air/fuel ratio $488 - - $1,688
-
MMBtu
$(-1,200.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,255 $300 $3,255
10,153
kWh
- - -
04 2.4235: Remove or close off unneeded compressed air lines $5,523 $1,537 $5,523
17,222
kWh
- - -
05 2.2511: Insulate bare equipment $7,711 $3,227 - $7,711
-
MMBtu
- -
06 2.7224: Reduce space conditioning during non-working hours $2,550 $1,334 $2,550
7,952
kWh
- - -
07 2.2135: Repair and eliminate steam leaks $2,960 $2,345 - $2,960
-
MMBtu
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $202 $192 $202
631
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,582 $23,946 $17,582
54,826
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $26,991 $61,830 $25,653
79,992
kWh
- $1,202 $136
TOTAL RECOMMENDED $85,204 $94,711 $73,907
230,463
kWh
$12,359
-
MMBtu
$(-1,198.0) $136
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs