Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,332

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0206 #06 Y:2010 Eliminate or reduce compressed air usage $5,757 $2,400
MI0206 #05 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $6,064 $1,320
MI0206 #04 Y:2010 Reduce the pressure of compressed air to the minimum required $6,348 $50
MI0206 #03 Y:2010 Turn off equipment when not in use $7,977 $2,300
MI0206 #02 Y:2010 Use or replace with energy efficient substitutes $10,476 $44,779
MI0206 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $16,265 $37,814
MI0205 #06 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $1,412 $1,320
MI0205 #05 Y:2010 Lower temperature during the winter season and vice-versa $3,114 $2,500
MI0205 #04 Y:2010 Install vinyl strip / high speed / air curtain doors $4,662 $17,186
MI0205 #03 Y:2010 Install partitions to reduce size of conditioned space $4,980 $18,280
MI0205 #02 Y:2010 Install / repair insulation on steam lines $8,973 $1,984
MI0205 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $17,634 $38,332
UA3014 #09 Y:2010 Utilize higher efficiency lamps and/or ballasts $269,372 $630,225
UA3014 #08 Y:2010 Utilize higher efficiency lamps and/or ballasts $92,285 $51,748
UA3014 #07 Y:2010 Optimize plant power factor $29,663 $26,400
UA3014 #06 Y:2010 Disconnect ballasts $5,801 $405
UA3014 #05 Y:2010 Install occupancy sensors $20,767 $13,730
UA3014 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $16,700 $60,860
UA3014 #03 Y:2010 Clean and maintain refrigerant condensers and towers $72,048 $98,000
UA3014 #02 Y:2010 Install outside air damper / economizer on hvac unit $71,901 $30,750