Assessment Year | 2011 |
---|---|
Principal Product | Boats |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $50 M to 100M |
# of Employees | 190 |
Plant Area |
200,000
ft2
|
Annual Production | 1,377
pieces
|
Production Hrs. Annual | 2,295
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $303,161 | 3,526,662 |
kWh
|
$0.086 |
Electricity Demand | $47,114 | 10,391 |
kW-mo/yr
|
$4.53 |
Electricity Fees | $32,390 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,995 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,995 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,265 | $37,814 |
$12,751
148,269
kWh
|
$3,514
-
kW-mo/yr
|
|
02 | 2.4322: Use or replace with energy efficient substitutes | $10,476 | $44,779 |
$8,206
95,512
kWh
|
$2,270
-
kW-mo/yr
|
|
03 | 2.6218: Turn off equipment when not in use | $7,977 | $2,300 |
$6,184
71,907
kWh
|
$1,793
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,348 | $50 |
$5,579
64,876
kWh
|
$769
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,064 | $1,320 |
$5,579
66,313
kWh
|
$485
-
kW-mo/yr
|
|
06 | 2.4239: Eliminate or reduce compressed air usage | $5,757 | $2,400 |
$4,515
52,496
kWh
|
$1,242
-
kW-mo/yr
|
|
07 | 2.4323: Use optimum size and capacity equipment | $2,108 | $4,771 |
$2,000
23,257
kWh
|
$108
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $54,995 | $93,434 |
$44,814
522,630
kWh
|
$10,181
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $54,995 | $93,434 |
$44,814
522,630
kWh
|
$10,181
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs