ITAC Assessment: GT0212
ITAC logo
ITAC Assessment: GT0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product WOVEN RUGS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area
n/a
Annual Production 21,500
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,875 614,889
kWh
Natural Gas $46,201 8,055
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,232

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1224: Replace boiler $8,550 $25,000 - $8,550
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $2,540 $250 - $2,540
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $334 $192 - $334
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,069 $145 $1,069
17,878
kWh
-
05 2.4133: Use most efficient type of electric motors $739 $861 $739
12,309
kWh
-
TOTAL RECOMMENDED $13,232 $26,448 $1,808
30,187
kWh
$11,424
-
MMBtu
TOTAL IMPLEMENTED $13,232 $26,448 $1,808
30,187
kWh
$11,424
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs