ITAC Assessment: MA0186
ITAC logo
ITAC Assessment: MA0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ETCHED METALS
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,423
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,024 1,082,063
kWh
Natural Gas $21,022 3,367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,609 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,237

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $1,664 $5,000 $1,664
21,688
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,372 $5,957 $1,530
19,930
kWh
$842
-
MMBtu
-
03 2.6231: Utilize controls to operate equipment only when needed $4,848 $500 $3,910
50,996
kWh
$938
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,333 $9,634 $1,007
13,189
kWh
- $326
05 2.7221: Lower temperature during the winter season and vice-versa $3,130 $1,195 $32
1,465
kWh
$3,098
-
MMBtu
-
06 2.2514: Cover open tanks $1,262 $229 $1,262
16,413
kWh
- -
TOTAL RECOMMENDED $14,609 $22,515 $9,405
123,681
kWh
$4,878
-
MMBtu
$326
TOTAL IMPLEMENTED $12,237 $16,558 $7,875
103,751
kWh
$4,036
-
MMBtu
$326
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs