Assessment Year | 2021 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
110,000
ft2
|
Annual Production | 107,440
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $203,224 | 2,927,871 |
kWh
|
$0.069 | |
Electricity Demand | $44,134 | 7,776 |
kW-mo/yr
|
$5.68 | |
Electricity Fees | $551 | - |
|
- | |
Natural Gas | $25,719 | 4,212 |
MMBtu
|
$6.11 | |
Waste Disposal Costs | |||||
Water Usage | $52,864 | 17,647 |
Tgal
|
$3.00 | |
Water Disposal | $119,982 | 17,647 |
Tgal
|
$6.80 | |
TOTAL YEARLY COSTS | $446,474 | ||||
RECOMMENDED SAVINGS* | $15,028 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,908 | $340 |
$3,515
50,652
kWh
|
$393
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,027 | $4,000 |
$924
13,314
kWh
|
$103
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $541 | - |
$442
6,370
kWh
|
$99
-
kW-mo/yr
|
- | |
04 | 2.4226: Use / purchase optimum sized compressor | $138 | - |
$110
1,585
kWh
|
$28
-
kW-mo/yr
|
- | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $3,922 | $10,000 | - | - |
$3,922
-
MMBtu
|
|
06 | 2.1241: Reduce excessive boiler blowdown | $2,088 | $4,500 | - | - |
$2,088
-
MMBtu
|
|
07 | 2.2163: Use minimum steam operating pressure | $1,533 | - | - | - |
$1,533
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $995 | - | - | - |
$995
-
MMBtu
|
|
09 | 2.2164: Turn off steam tracing during mild weather | $876 | - | - | - |
$876
-
MMBtu
|
|
TOTAL RECOMMENDED | $15,028 | $18,840 |
$4,991
71,921
kWh
|
$623
-
kW-mo/yr
|
$9,414
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs