ITAC Assessment: UD1029
ITAC logo
ITAC Assessment: UD1029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 110,000
ft2
Annual Production 107,440
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,224 2,927,871
kWh
Electricity Demand $44,134 7,776
kW-mo/yr
Electricity Fees $551 -
Natural Gas $25,719 4,212
MMBtu
Waste Disposal Costs
Water Usage $52,864 17,647
Tgal
Water Disposal $119,982 17,647
Tgal
TOTAL YEARLY COSTS $446,474
RECOMMENDED SAVINGS* $15,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,908 $340 $3,515
50,652
kWh
$393
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,027 $4,000 $924
13,314
kWh
$103
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $541 - $442
6,370
kWh
$99
-
kW-mo/yr
-
04 2.4226: Use / purchase optimum sized compressor $138 - $110
1,585
kWh
$28
-
kW-mo/yr
-
05 2.2414: Use waste heat from hot flue gases to preheat $3,922 $10,000 - - $3,922
-
MMBtu
06 2.1241: Reduce excessive boiler blowdown $2,088 $4,500 - - $2,088
-
MMBtu
07 2.2163: Use minimum steam operating pressure $1,533 - - - $1,533
-
MMBtu
08 2.1233: Analyze flue gas for proper air/fuel ratio $995 - - - $995
-
MMBtu
09 2.2164: Turn off steam tracing during mild weather $876 - - - $876
-
MMBtu
TOTAL RECOMMENDED $15,028 $18,840 $4,991
71,921
kWh
$623
-
kW-mo/yr
$9,414
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs