Assessment Year | 2005 |
---|---|
Principal Product | Plastic injection molding |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
125,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $530,515 | 7,829,892 |
kWh
|
$0.068 |
Electricity Demand | $146,829 | 16,289 |
kW-mo/yr
|
$9.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,298 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,184 | $24,750 |
$10,184
150,206
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,898 | $600 |
$8,342
123,105
kWh
|
$1,556
-
kW-mo/yr
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,830 | - | - | - | $6,830 | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,400 | - | - | - | $6,400 | - | |
05 | 2.4323: Use optimum size and capacity equipment | $4,599 | $1,388 |
$3,410
50,291
kWh
|
$1,189
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,417 | $59,829 |
$18,759
276,678
kWh
|
$4,658
-
kW-mo/yr
|
- | - | |
07 | 2.7145: Install skylights | $1,046 | $800 |
$1,046
15,422
kWh
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $102 | $100 |
$102
1,500
kWh
|
- | - | - | |
09 | 3.5217: Reuse / recycle/ sell paper products | $8,102 | - | - | - | - |
$8,102
-
lb
|
|
10 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,882 | - | - | - | - |
$1,882
-
lb
|
|
TOTAL RECOMMENDED | $72,460 | $87,467 |
$41,843
617,202
kWh
|
$7,403
-
kW-mo/yr
|
$13,230 |
$9,984
-
lb
|
||
TOTAL IMPLEMENTED | $46,298 | $61,917 |
$30,613
451,574
kWh
|
$7,403
-
kW-mo/yr
|
$6,400 |
$1,882
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs