ITAC Assessment: MA0383
ITAC logo
ITAC Assessment: MA0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Bread and Rolls
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 23,825
ft2
Annual Production 91,000
pieces
Production Hrs. Annual 7,980
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,059 1,164,420
kWh
Electricity Demand $12,837 2,594
kW-mo/yr
Natural Gas $105,812 17,859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 3.5317: Sell / offer by-product as animal feed $6,300 - - - - - $6,300
-
lb
02 3.4145: Use magnetic technology to treat water $4,800 $7,335 - - - $4,800
-
gal
-
03 2.3212: Optimize plant power factor $1,744 $1,890 - $1,744
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $1,530 $4,709 - - $1,530
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $772 $572 $772
10,551
kWh
- - - -
TOTAL RECOMMENDED $15,146 $14,506 $772
10,551
kWh
$1,744
-
kW-mo/yr
$1,530
-
MMBtu
$4,800
-
gal
$6,300
-
lb
TOTAL IMPLEMENTED $6,300 - - - - - $6,300
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs