ITAC Assessment: MI0205
ITAC logo
ITAC Assessment: MI0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Rubber Hardware
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 70,000
ft2
Annual Production 10,800
pieces
Production Hrs. Annual 2,678
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,075 1,238,185
kWh
Electricity Demand $36,687 4,266
kW-mo/yr
Electricity Fees $14,985 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,775 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,634 $38,332 $10,874
175,383
kWh
$6,760
-
kW-mo/yr
02 2.2136: Install / repair insulation on steam lines $8,973 $1,984 $5,533
89,236
kWh
$3,440
-
kW-mo/yr
03 2.7496: Install partitions to reduce size of conditioned space $4,980 $18,280 $3,071
49,527
kWh
$1,909
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,662 $17,186 $2,873
46,337
kWh
$1,789
-
kW-mo/yr
05 2.7221: Lower temperature during the winter season and vice-versa $3,114 $2,500 $1,919
30,955
kWh
$1,195
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,412 $1,320 $870
14,031
kWh
$542
-
kW-mo/yr
TOTAL RECOMMENDED $40,775 $79,602 $25,140
405,469
kWh
$15,635
-
kW-mo/yr
TOTAL IMPLEMENTED $3,114 $2,500 $1,919
30,955
kWh
$1,195
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs