ITAC Assessment: DL0141
ITAC logo
ITAC Assessment: DL0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Specialty Cans
NAICS 332431: Metal Can Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 370,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,717
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $916,010 8,430,700
kWh
Natural Gas $307,277 56,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $5,650 $5,120 $5,650
52,358
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $9,730 $8,640 $9,730
90,060
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $16,965 $960 $16,965
157,075
kWh
-
04 2.6218: Turn off equipment when not in use $12,550 - $12,550
115,140
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,730 $43,955 $33,730
309,420
kWh
-
06 2.7291: Reschedule and rearrange multiple-source heating systems $12,857 - $1,824
15,200
kWh
$11,033
-
MMBtu
07 2.6231: Utilize controls to operate equipment only when needed $3,770 - $3,770
34,900
kWh
-
08 2.6218: Turn off equipment when not in use $3,410 - $3,410
31,560
kWh
-
09 2.7261: Install timers and/or thermostats $860 - - $860
-
MMBtu
TOTAL RECOMMENDED $99,522 $58,675 $87,629
805,713
kWh
$11,893
-
MMBtu
TOTAL IMPLEMENTED $62,382 $14,720 $50,489
464,733
kWh
$11,893
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs