ITAC Assessment: UA3014
ITAC logo
ITAC Assessment: UA3014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Diesel Engines
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 999
Plant Area 544,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,571,133 49,444,865
kWh
Electricity Demand $693,252 94,064
kW-mo/yr
Natural Gas $155,849 11,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $657,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $105,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $78,640 $8,320 $39,260
755,000
kWh
$10,466
-
kW-mo/yr
$28,914
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $71,901 $30,750 $66,300
1,275,000
kWh
$5,601
-
kW-mo/yr
-
03 2.7211: Clean and maintain refrigerant condensers and towers $72,048 $98,000 $49,348
949,000
kWh
$22,700
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,700 $60,860 $13,125
252,396
kWh
$3,575
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $20,767 $13,730 $20,767
399,360
kWh
- -
06 2.7122: Disconnect ballasts $5,801 $405 $4,556
87,610
kWh
$1,245
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $29,663 $26,400 - $29,663
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $92,285 $51,748 $72,519
1,394,593
kWh
$19,766
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $269,372 $630,225 $211,680
4,070,773
kWh
$57,692
-
kW-mo/yr
-
TOTAL RECOMMENDED $657,177 $920,438 $477,555
9,183,732
kWh
$150,708
-
kW-mo/yr
$28,914
-
MMBtu
TOTAL IMPLEMENTED $105,208 $22,455 $64,583
1,241,970
kWh
$11,711
-
kW-mo/yr
$28,914
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs