| Assessment Year | 2021 |
|---|---|
| Principal Product | Cleaning, Polishing, & Sanitation Preparations |
| NAICS | 325612: Polish and Other Sanitation Good Manufacturing |
| SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
290,000
ft2
|
| Annual Production | 20,000
Tgal
|
| Production Hrs. Annual | 3,744
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $112,421 | 3,038,400 |
kWh
|
$0.037 | |
| Electricity Demand | $51,809 | 8,722 |
kW-mo/yr
|
$5.94 | |
| Natural Gas | $30,545 | 8,727 |
MMBtu
|
$3.50 | |
| LPG | $29,078 | 1,899 |
MMBtu
|
$15.31 | |
| Waste Disposal Costs | |||||
| Water Usage | $141,690 | 13,023 |
Tgal
|
$10.88 | |
| TOTAL YEARLY COSTS | $365,543 | ||||
| RECOMMENDED SAVINGS* | $21,844 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $16,854 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,296 | $2,422 | - | - | - |
$2,296
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $827 | - |
$827
22,344
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $569 | $512 |
$569
15,375
kWh
|
- | - | - | |
| 04 | 2.3212: Optimize plant power factor | $2,125 | $8,240 | - | - | $2,125 | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,027 | $38,688 |
$10,581
285,982
kWh
|
$5,446
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $21,844 | $49,862 |
$11,977
323,701
kWh
|
$5,446
-
kW-mo/yr
|
$2,125 |
$2,296
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,854 | $38,688 |
$11,408
308,326
kWh
|
$5,446
-
kW-mo/yr
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs