ITAC Assessment: OK1046
ITAC logo
ITAC Assessment: OK1046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Cleaning, Polishing, & Sanitation Preparations
NAICS 325612: Polish and Other Sanitation Good Manufacturing
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 290,000
ft2
Annual Production 20,000
Tgal
Production Hrs. Annual 3,744
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,421 3,038,400
kWh
Electricity Demand $51,809 8,722
kW-mo/yr
Natural Gas $30,545 8,727
MMBtu
LPG $29,078 1,899
MMBtu
Waste Disposal Costs
Water Usage $141,690 13,023
Tgal
TOTAL YEARLY COSTS $365,543
RECOMMENDED SAVINGS* $21,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,296 $2,422 - - - $2,296
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $827 - $827
22,344
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $569 $512 $569
15,375
kWh
- - -
04 2.3212: Optimize plant power factor $2,125 $8,240 - - $2,125 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $16,027 $38,688 $10,581
285,982
kWh
$5,446
-
kW-mo/yr
- -
TOTAL RECOMMENDED $21,844 $49,862 $11,977
323,701
kWh
$5,446
-
kW-mo/yr
$2,125 $2,296
-
MMBtu
TOTAL IMPLEMENTED $16,854 $38,688 $11,408
308,326
kWh
$5,446
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs