Assessment Year | 2021 |
---|---|
Principal Product | Cleaning, Polishing, & Sanitation Preparations |
NAICS | 325612: Polish and Other Sanitation Good Manufacturing |
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
290,000
ft2
|
Annual Production | 20,000
Tgal
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $112,421 | 3,038,400 |
kWh
|
$0.037 | |
Electricity Demand | $51,809 | 8,722 |
kW-mo/yr
|
$5.94 | |
Natural Gas | $30,545 | 8,727 |
MMBtu
|
$3.50 | |
LPG | $29,078 | 1,899 |
MMBtu
|
$15.31 | |
Waste Disposal Costs | |||||
Water Usage | $141,690 | 13,023 |
Tgal
|
$10.88 | |
TOTAL YEARLY COSTS | $365,543 | ||||
RECOMMENDED SAVINGS* | $21,844 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $16,854 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $2,296 | $2,422 | - | - | - |
$2,296
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $827 | - |
$827
22,344
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $569 | $512 |
$569
15,375
kWh
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $2,125 | $8,240 | - | - | $2,125 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,027 | $38,688 |
$10,581
285,982
kWh
|
$5,446
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $21,844 | $49,862 |
$11,977
323,701
kWh
|
$5,446
-
kW-mo/yr
|
$2,125 |
$2,296
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,854 | $38,688 |
$11,408
308,326
kWh
|
$5,446
-
kW-mo/yr
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs