Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,122

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0446 #04 Y:2011 Reduce illumination to minimum necessary levels $14,073 $4,900
NC0446 #03 Y:2011 Install outside air damper / economizer on hvac unit $108,281 $84,000
NC0446 #02 Y:2011 Recover waste heat from equipment $92,397 $210,000
NC0446 #01 Y:2011 Replace existing hvac unit with high efficiency model $171,632 $1,063,000
MAS018 #09 Y:2011 Turn off equipment when not in use $1,767 -
MAS018 #08 Y:2011 Reduce temperature of process equipment when on standby $2,045 $4,600
MAS018 #07 Y:2011 Reduce the pressure of compressed air to the minimum required $4,027 -
MAS018 #06 Y:2011 Use cooling tower or economizer to replace chiller cooling $6,270 $22,500
MAS018 #05 Y:2011 Turn off equipment when not in use $10,200 $1,775
MAS018 #04 Y:2011 Reduce ventilation air $19,133 $2,100
MAS018 #03 Y:2011 Replace electrically-operated equipment with fossil fuel equipment $29,548 $92,700
MAS018 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $22,975 $6,000
MAS018 #01 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $83,121 $172,430
GT0891 #10 Y:2011 Utilize higher efficiency lamps and/or ballasts $4,720 $20,395
GT0891 #09 Y:2011 Utilize energy-efficient belts and other improved mechanisms $3,190 $12,795
GT0891 #08 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $3,990 $12,300
GT0891 #07 Y:2011 Utilize higher efficiency lamps and/or ballasts $4,852 $88,000
GT0891 #06 Y:2011 Recover waste heat from equipment $34,362 $25,440
GT0891 #05 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $47,301 $12,500
GT0891 #04 Y:2011 Utilize higher efficiency lamps and/or ballasts $625 $25,217