ITAC Assessment: MAS018
ITAC logo
ITAC Assessment: MAS018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Shaft Seals
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $50
M
to 100
M
# of Employees 241
Plant Area 35,000
ft2
Annual Production 23,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,085,083 8,652,976
kWh
Electricity Demand $147,792 21,265
kW-mo/yr
Natural Gas $133,185 14,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $83,121 $172,430 $75,115
599,000
kWh
$8,006
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $22,975 $6,000 $22,975
183,210
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $29,548 $92,700 $27,544
219,648
kWh
$2,004
-
kW-mo/yr
-
04 2.7314: Reduce ventilation air $19,133 $2,100 $5,706
45,500
kWh
- $13,427
-
MMBtu
05 2.6218: Turn off equipment when not in use $10,200 $1,775 $10,200
81,344
kWh
- -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $6,270 $22,500 $6,270
49,998
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,027 - $2,109
16,819
kWh
$1,918
-
kW-mo/yr
-
08 2.6241: Reduce temperature of process equipment when on standby $2,045 $4,600 $2,045
16,307
kWh
- -
09 2.6218: Turn off equipment when not in use $1,767 - $1,767
14,092
kWh
- -
TOTAL RECOMMENDED $179,086 $302,105 $153,731
1,225,918
kWh
$11,928
-
kW-mo/yr
$13,427
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs