ITAC Assessment: GT0891
ITAC logo
ITAC Assessment: GT0891
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product FiberCement Boards-Siding
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 159
Plant Area 294,500
ft2
Annual Production 26,604
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,051,708 15,057,818
kWh
Electricity Demand $63,236 38,209
kW-mo/yr
Natural Gas $550,658 100,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $14,552 - $14,552
287,013
kWh
- - -
02 2.6218: Turn off equipment when not in use $304 - $304
6,002
kWh
- - -
03 2.2136: Install / repair insulation on steam lines $610 $225 - - $610
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $625 $25,217 $364
6,386
kWh
$261
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $47,301 $12,500 $30,785
607,199
kWh
$16,516
-
kW-mo/yr
- -
06 2.2437: Recover waste heat from equipment $34,362 $25,440 - - $34,362
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,852 $88,000 $2,826
49,572
kWh
$2,026
-
kW-mo/yr
- -
08 2.1243: Use heat from boiler blowdown to preheat boiler feed water $3,990 $12,300 - - $3,990
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,190 $12,795 $1,858
32,601
kWh
$1,332
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $4,720 $20,395 $2,118
37,162
kWh
$1,518
-
kW-mo/yr
- $1,084
TOTAL RECOMMENDED $114,506 $196,872 $52,807
1,025,935
kWh
$21,653
-
kW-mo/yr
$38,962
-
MMBtu
$1,084
TOTAL IMPLEMENTED $39,839 $138,657 $3,190
55,958
kWh
$2,287
-
kW-mo/yr
$34,362
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs