5,103
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0728 #04 Y:2001 | 04 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $13,916 | - | |
| GT0728 #03 Y:2001 | 03 | 2001 | Maintain machines to reduce leaks | $2,765 | $3,150 | |
| GT0728 #02 Y:2001 | 02 | 2001 | Utilize higher efficiency lamps and/or ballasts | $1,952 | $6,346 | |
| GT0728 #01 Y:2001 | 01 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,492 | $750 | |
| BD0205 #10 Y:2001 | 10 | 2001 | Utilize higher efficiency lamps and/or ballasts | $350 | $360 | |
| BD0205 #09 Y:2001 | 09 | 2001 | Utilize energy-efficient belts and other improved mechanisms | $552 | $800 | |
| BD0205 #08 Y:2001 | 08 | 2001 | Install occupancy sensors | $1,324 | $1,425 | |
| BD0205 #07 Y:2001 | 07 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,387 | $300 | |
| BD0205 #06 Y:2001 | 06 | 2001 | Use waste heat from flue gases to heat space conditioning air | $1,411 | $1,500 | |
| BD0205 #05 Y:2001 | 05 | 2001 | Install compressor air intakes in coolest locations | $2,003 | $1,000 | |
| BD0205 #04 Y:2001 | 04 | 2001 | Use most efficient type of electric motors | $3,089 | $4,800 | |
| BD0205 #03 Y:2001 | 03 | 2001 | Install automatic stack damper | $4,550 | $5,000 | |
| BD0205 #02 Y:2001 | 02 | 2001 | Use radiant heater for spot heating | $25,105 | $60,000 | |
| BD0205 #01 Y:2001 | 01 | 2001 | Use waste heat from flue gases to heat space conditioning air | $133,965 | $75,270 | |
| MS0203 #06 Y:2001 | 06 | 2001 | Utilize energy-efficient belts and other improved mechanisms | $286 | $375 | |
| MS0203 #05 Y:2001 | 05 | 2001 | Optimize plant power factor | $4,266 | $3,600 | |
| MS0203 #04 Y:2001 | 04 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,736 | $1,189 | |
| MS0203 #03 Y:2001 | 03 | 2001 | Recover waste heat from equipment | $5,201 | $427 | |
| MS0203 #02 Y:2001 | 02 | 2001 | Replace electrically-operated equipment with fossil fuel equipment | $30,947 | $16,790 | |
| MS0203 #01 Y:2001 | 01 | 2001 | Recover waste heat from equipment | $7,097 | $6,416 |