ITAC Assessment: MS0203
ITAC logo
ITAC Assessment: MS0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Upholstered motion furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $100
M
to 500
M
# of Employees 465
Plant Area 500,000
ft2
Annual Production 345,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,789 3,234,174
kWh
Electricity Demand $113,525 12,935
kW-mo/yr
Electricity Fees $8,463 -
Natural Gas $34,584 3,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $7,097 $6,416 - - - $7,097
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $30,947 $16,790 - - - $30,947
-
MMBtu
03 2.2437: Recover waste heat from equipment $5,201 $427 - - - $5,201
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,736 $1,189 $4,666
131,594
kWh
- $70 -
05 2.3212: Optimize plant power factor $4,266 $3,600 - - $4,266 -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $286 $375 $177
4,982
kWh
$105
-
kW-mo/yr
$4 -
TOTAL RECOMMENDED $52,533 $28,797 $4,843
136,576
kWh
$105
-
kW-mo/yr
$4,340 $43,245
-
MMBtu
TOTAL IMPLEMENTED $39,949 $21,579 $4,666
131,594
kWh
- $4,336 $30,947
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs