| Assessment Year | 1990 |
|---|---|
| Principal Product | REFRIGERATED BOXES |
| NAICS |
n/a
|
| SIC | 3449: Miscellaneous Structural Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $173,040 | 3,422,040 |
kWh
|
$0.051 |
| Natural Gas | $74,689 | 22,429 |
MMBtu
|
$3.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,970 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,814 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,002 | - |
$1,046
48,066
kWh
|
$5,994
-
MMBtu
|
$962 | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $2,804 | $500 |
$1,428
65,651
kWh
|
- | $1,376 | |
| 03 | 2.2437: Recover waste heat from equipment | $1,306 | $300 | - | - | $1,306 | |
| 04 | 2.4323: Use optimum size and capacity equipment | $1,599 | - |
$1,599
24,912
kWh
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $10,040 | $5,000 |
$1,962
89,977
kWh
|
$8,078
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,103 | $1,680 |
$944
18,464
kWh
|
- | $159 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,116 | $5,820 |
$2,116
28,429
kWh
|
- | - | |
| TOTAL RECOMMENDED | $26,970 | $13,300 |
$9,095
275,499
kWh
|
$14,072
-
MMBtu
|
$3,803 | ||
| TOTAL IMPLEMENTED | $14,814 | $2,480 |
$5,017
157,093
kWh
|
$5,994
-
MMBtu
|
$3,803 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs