ITAC Assessment: UD0318
ITAC logo
ITAC Assessment: UD0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product REFRIGERATED BOXES
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,040 3,422,040
kWh
Natural Gas $74,689 22,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $8,002 - $1,046
48,066
kWh
$5,994
-
MMBtu
$962
02 2.4239: Eliminate or reduce compressed air usage $2,804 $500 $1,428
65,651
kWh
- $1,376
03 2.2437: Recover waste heat from equipment $1,306 $300 - - $1,306
04 2.4323: Use optimum size and capacity equipment $1,599 - $1,599
24,912
kWh
- -
05 2.7261: Install timers and/or thermostats $10,040 $5,000 $1,962
89,977
kWh
$8,078
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,103 $1,680 $944
18,464
kWh
- $159
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,116 $5,820 $2,116
28,429
kWh
- -
TOTAL RECOMMENDED $26,970 $13,300 $9,095
275,499
kWh
$14,072
-
MMBtu
$3,803
TOTAL IMPLEMENTED $14,814 $2,480 $5,017
157,093
kWh
$5,994
-
MMBtu
$3,803
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs