5,492
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OD0153 #04 Y:1999 | 04 | 1999 | Reduce space conditioning during non-working hours | $439 | $420 | |
| OD0153 #03 Y:1999 | 03 | 1999 | Install occupancy sensors | $405 | $285 | |
| OD0153 #02 Y:1999 | 02 | 1999 | Reduce the pressure of compressed air to the minimum required | $871 | $20 | |
| OD0153 #01 Y:1999 | 01 | 1999 | Utilize higher efficiency lamps and/or ballasts | $4,506 | $25,512 | |
| UL0239 #02 Y:1999 | 02 | 1999 | Use fossil fuel powered generator during peak demand periods | $30,070 | $167,000 | |
| UL0239 #01 Y:1999 | 01 | 1999 | Use insulation in furnaces to facilitate heating / cooling | $10,420 | $3,300 | |
| UD0591 #03 Y:1999 | 03 | 1999 | Sell used plates to an aluminum recycler | $2,362 | - | |
| UD0591 #02 Y:1999 | 02 | 1999 | Use plant owned transformers or lease transformers | $12,000 | $15,000 | |
| UD0591 #01 Y:1999 | 01 | 1999 | Reduce illumination to minimum necessary levels | $12,378 | $12,320 | |
| BD0156 #09 Y:1999 | 09 | 1999 | Pay bills on time to avoid late fees | $482 | - | |
| BD0156 #08 Y:1999 | 08 | 1999 | Modify current incentive program | $2,990 | $7,000 | |
| BD0156 #07 Y:1999 | 07 | 1999 | Clear and rent existing space | $14,100 | $20,000 | |
| BD0156 #06 Y:1999 | 06 | 1999 | Install compressor air intakes in coolest locations | $321 | $800 | |
| BD0156 #05 Y:1999 | 05 | 1999 | Utilize higher efficiency lamps and/or ballasts | $1,167 | $821 | |
| BD0156 #04 Y:1999 | 04 | 1999 | Use most efficient type of electric motors | $1,749 | $3,340 | |
| BD0156 #03 Y:1999 | 03 | 1999 | Utilize higher efficiency lamps and/or ballasts | $2,358 | $6,095 | |
| BD0156 #02 Y:1999 | 02 | 1999 | Install / repair insulation on steam lines | $2,732 | $7,350 | |
| BD0156 #01 Y:1999 | 01 | 1999 | Use radiant heater for spot heating | $12,223 | $40,500 | |
| WV0187 #13 Y:1999 | 13 | 1999 | Add equipment/ operators to reduce production bottleneck | $15,000 | $1,200 | |
| WV0187 #12 Y:1999 | 12 | 1999 | Replace existing equipment with more suitable substitutes | $20,000 | $7,000 |