Assessment Year | 2000 |
---|---|
Principal Product | Explosion prooof enclosure systems |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
120,321
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $277,372 | 4,440,504 |
kWh
|
$0.062 |
Electricity Demand | $83,118 | 6,179 |
kW-mo/yr
|
$13.45 |
Electricity Fees | $3,324 | - |
|
- |
Natural Gas | $15,805 | 9,729 |
MMBtu
|
$1.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,448 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $60,258 | $11,500 |
$60,258
454,865
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,150 | $50 |
$3,150
49,824
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,205 | $134 |
$1,205
19,050
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $427 | $100 |
$427
6,741
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $1,056 | $350 |
$1,056
16,706
kWh
|
- | - | |
06 | 2.2628: Utilize a less expensive cooling method | $569 | $300 |
$569
10,258
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $815 | $740 |
$815
4,982
kWh
|
- | - | |
08 | 2.7241: Install outside air damper / economizer on hvac unit | $1,120 | $1,350 |
$1,120
17,585
kWh
|
- | - | |
09 | 2.7144: Install spectral reflectors / delamp | $28,444 | $15,958 |
$28,444
449,883
kWh
|
- | - | |
10 | 3.5316: Contract a wood pallet recycling company | $252 | $50 | - |
$252
-
lb
|
- | |
11 | 3.5217: Reuse / recycle/ sell paper products | $5,304 | $75 | - |
$5,304
-
lb
|
- | |
12 | 4.652: Replace existing equipment with more suitable substitutes | $20,000 | $7,000 | - | - | $20,000 | |
13 | 4.111: Add equipment/ operators to reduce production bottleneck | $15,000 | $1,200 | - | - | $15,000 | |
TOTAL RECOMMENDED | $137,600 | $38,807 |
$97,044
1,029,894
kWh
|
$5,556
-
lb
|
$35,000 | ||
TOTAL IMPLEMENTED | $39,448 | $17,323 |
$33,892
528,136
kWh
|
$5,556
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs