Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Explosion prooof enclosure systems
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 120,321
ft2
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,372 4,440,504
kWh
Electricity Demand $83,118 6,179
kW-mo/yr
Electricity Fees $3,324 -
Natural Gas $15,805 9,729
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $60,258 $11,500 $60,258
454,865
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,150 $50 $3,150
49,824
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,205 $134 $1,205
19,050
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $427 $100 $427
6,741
kWh
- -
05 2.4314: Use synthetic lubricant $1,056 $350 $1,056
16,706
kWh
- -
06 2.2628: Utilize a less expensive cooling method $569 $300 $569
10,258
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $815 $740 $815
4,982
kWh
- -
08 2.7241: Install outside air damper / economizer on hvac unit $1,120 $1,350 $1,120
17,585
kWh
- -
09 2.7144: Install spectral reflectors / delamp $28,444 $15,958 $28,444
449,883
kWh
- -
10 3.5316: Contract a wood pallet recycling company $252 $50 - $252
-
lb
-
11 3.5217: Reuse / recycle/ sell paper products $5,304 $75 - $5,304
-
lb
-
12 4.652: Replace existing equipment with more suitable substitutes $20,000 $7,000 - - $20,000
13 4.111: Add equipment/ operators to reduce production bottleneck $15,000 $1,200 - - $15,000
TOTAL RECOMMENDED $137,600 $38,807 $97,044
1,029,894
kWh
$5,556
-
lb
$35,000
TOTAL IMPLEMENTED $39,448 $17,323 $33,892
528,136
kWh
$5,556
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs