ITAC Assessment: BD0156
ITAC logo
ITAC Assessment: BD0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Concrete Batch Plants
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 86,000
ft2
Annual Production 3,900,000
lb
Production Hrs. Annual 5,252
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,534 1,989,742
kWh
Electricity Demand $3,898 2,228
kW-mo/yr
Electricity Fees $5,824 -
Natural Gas $44,320 13,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings By-product Production Savings
01 2.7231: Use radiant heater for spot heating $12,223 $40,500 $1,820
46,893
kWh
$125
-
kW-mo/yr
$10,278
-
MMBtu
- - - -
02 2.2136: Install / repair insulation on steam lines $2,732 $7,350 - - $2,732
-
MMBtu
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,358 $6,095 $1,908
47,773
kWh
$191
-
kW-mo/yr
- $125 $134 - -
04 2.4133: Use most efficient type of electric motors $1,749 $3,340 $1,627
40,739
kWh
$122
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,167 $821 $1,035
25,791
kWh
$132
-
kW-mo/yr
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $321 $800 $292
7,327
kWh
$29
-
kW-mo/yr
- - - - -
07 4.521: Clear and rent existing space $14,100 $20,000 - - - - - $14,100 -
08 4.421: Modify current incentive program $2,990 $7,000 - - - - - - $2,990
09 4.821: Pay bills on time to avoid late fees $482 - - - - - - $482 -
TOTAL RECOMMENDED $38,122 $85,906 $6,682
168,523
kWh
$599
-
kW-mo/yr
$13,010
-
MMBtu
$125 $134 $14,582 $2,990
TOTAL IMPLEMENTED $3,472 $7,000 - - - - - $482 $2,990
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs