ITAC Assessment: OK1104
ITAC logo
ITAC Assessment: OK1104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Processed meat
NAICS 311612: Meat Processed from Carcasses
SIC 2011: Meat Packing Plants
Sales Range $5
M
to 10
M
# of Employees 17
Plant Area 25,000
ft2
Annual Production 2,285,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,972 1,528,863
kWh
Electricity Demand $39,937 4,030
kW-mo/yr
LPG $33,468 1,279
MMBtu
Waste Disposal Costs
Water Usage $10,966 1,129
Tgal
TOTAL YEARLY COSTS $162,343
RECOMMENDED SAVINGS* $18,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $89 - $89
1,746
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,987 $1,552 $3,987
78,178
kWh
03 2.9114: Use solar heat to make electricty $14,088 $189,810 $14,088
276,226
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $179 $580 $179
3,515
kWh
TOTAL RECOMMENDED $18,343 $191,942 $18,343
359,665
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs