Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0431 #04 Y:1994 Use photocell controls $783 $180
OK0431 #03 Y:1994 Utilize energy-efficient belts and other improved mechanisms $1,773 -
OK0431 #02 Y:1994 Utilize a less expensive cooling method $3,276 $11,000
OK0431 #01 Y:1994 Reduce combustion air flow to optimum $23,728 $4,000
MO0118 #08 Y:1994 Analyze flue gas for proper air/fuel ratio $1,294 $300
MO0118 #07 Y:1994 Use synthetic lubricant $869 $336
MO0118 #06 Y:1994 Reduce the pressure of compressed air to the minimum required $1,742 $50
MO0118 #05 Y:1994 Install compressor air intakes in coolest locations $2,422 $273
MO0118 #04 Y:1994 Utilize energy-efficient belts and other improved mechanisms $940 $520
MO0118 #03 Y:1994 Use most efficient type of electric motors $5,982 $10,074
MO0118 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,307 $671
MO0118 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $5,502 $17,225
ME0132 #08 Y:1994 Increase electrical conductor size to reduce distribution losses $4,892 $1,200
ME0132 #07 Y:1994 Repair and eliminate steam leaks $286 $75
ME0132 #06 Y:1994 Analyze flue gas for proper air/fuel ratio $944 $400
ME0132 #05 Y:1994 Turn off equipment when not in use $792 -
ME0132 #04 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $1,931 $500
ME0132 #03 Y:1994 Insulate bare equipment $1,625 $5,100
ME0132 #02 Y:1994 Recover waste heat from equipment $363 $175
ME0132 #01 Y:1994 Install compressor air intakes in coolest locations $1,797 $300