ITAC Assessment: OK0431
ITAC logo
ITAC Assessment: OK0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Asphaltic Concrete
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 871,200
ft2
Annual Production 260,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,798 1,283,412
kWh
Natural Gas $110,076 43,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.1113: Reduce combustion air flow to optimum $23,728 $4,000 - $23,728
-
MMBtu
-
02 2.2628: Utilize a less expensive cooling method $3,276 $11,000 - - $3,276
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,773 - $1,773
53,048
kWh
- -
04 2.7134: Use photocell controls $783 $180 $783
17,585
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $694 $1,520 $694
24,912
kWh
- -
06 2.2511: Insulate bare equipment $79 $125 - $79
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $26 - $26
586
kWh
- -
TOTAL RECOMMENDED $30,359 $16,825 $3,276
96,131
kWh
$23,807
-
MMBtu
$3,276
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs