| Assessment Year | 1994 |
|---|---|
| Principal Product | pharmaceuticals |
| NAICS |
n/a
|
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
166,200
ft2
|
| Annual Production | 25,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,374 | 2,649,766 |
kWh
|
$0.063 |
| Natural Gas | $64,537 | 14,807 |
MMBtu
|
$4.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $869 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,502 | $17,225 |
$5,502
87,046
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,307 | $671 |
$2,307
36,342
kWh
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $5,982 | $10,074 |
$5,982
94,666
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $940 | $520 |
$940
14,947
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,422 | $273 |
$2,422
38,394
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,742 | $50 |
$1,742
27,550
kWh
|
- | |
| 07 | 2.4314: Use synthetic lubricant | $869 | $336 |
$869
14,068
kWh
|
- | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,294 | $300 | - |
$1,294
-
MMBtu
|
|
| TOTAL RECOMMENDED | $21,058 | $29,449 |
$19,764
313,013
kWh
|
$1,294
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $869 | $336 |
$869
14,068
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs