ITAC Assessment: ME0132
ITAC logo
ITAC Assessment: ME0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Women's Shoes
NAICS
n/a
SIC 3144: Women's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 310
Plant Area 75,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,950 1,418,230
kWh
Fuel Oil #4 $24,340 5,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.4221: Install compressor air intakes in coolest locations $1,797 $300 $1,797
16,120
kWh
-
02 2.2437: Recover waste heat from equipment $363 $175 $363
2,931
kWh
-
03 2.2511: Insulate bare equipment $1,625 $5,100 - $1,625
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,931 $500 $1,931
25,791
kWh
-
05 2.6218: Turn off equipment when not in use $792 - $792
7,034
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $944 $400 - $944
-
MMBtu
07 2.2135: Repair and eliminate steam leaks $286 $75 - $286
-
MMBtu
08 2.3522: Increase electrical conductor size to reduce distribution losses $4,892 $1,200 $4,892
81,477
kWh
-
TOTAL RECOMMENDED $12,630 $7,750 $9,775
133,353
kWh
$2,855
-
MMBtu
TOTAL IMPLEMENTED $5,750 $1,275 $4,520
48,945
kWh
$1,230
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs