Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0303 #06 Y:1994 Repair and eliminate steam leaks $2,100 $1,250
CO0303 #05 Y:1994 Use most efficient type of electric motors $3,130 $5,790
CO0303 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $4,780 $16,000
CO0303 #03 Y:1994 Install compressor air intakes in coolest locations $5,150 $900
CO0303 #02 Y:1994 Recover waste heat from equipment $10,760 $55,130
CO0303 #01 Y:1994 Recover waste heat from equipment $15,990 $55,130
MA0308 #04 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $441 $110
MA0308 #03 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $7,420 $7,745
MA0308 #02 Y:1994 Repair or replace steam traps $19,471 $813
MA0308 #01 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $87,650 $18,145
MA0305 #08 Y:1994 Install equipment (eg compactor) to reduce disposal costs $10,350 $385
MA0305 #07 Y:1994 Recycle waste ink and cleanup solvent $24,185 $2,500
MA0305 #06 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $764 $180
MA0305 #05 Y:1994 Utilize energy-efficient belts and other improved mechanisms $698 -
MA0305 #04 Y:1994 Use radiant heater for spot heating $1,508 $5,569
MA0305 #03 Y:1994 Shade windows from summer sun $15,022 $41,394
MA0305 #02 Y:1994 Use adjustable frequency drive or multiple speed motors on existing system $4,978 $14,015
MA0305 #01 Y:1994 Recover waste heat from equipment $18,419 $10,078
ME0133 #03 Y:1994 Use small number of high output units instead of many small inefficient units $5,276 $7,200
ME0133 #02 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $18,453 $6,650