ITAC Assessment: MA0308
ITAC logo
ITAC Assessment: MA0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product silicon rubber; pressure-sensitive tape
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 148,000
ft2
Annual Production 4,000,000
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $568,648 5,639,508
kWh
Natural Gas $271,019 58,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $87,650 $18,145 $106,173
1,053,048
kWh
$(-18,523.0)
-
MMBtu
02 2.2113: Repair or replace steam traps $19,471 $813 $19,471
194,607
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,420 $7,745 $8,658
85,873
kWh
$(-1,238.0)
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $441 $110 $441
6,155
kWh
-
TOTAL RECOMMENDED $114,982 $26,813 $134,743
1,339,683
kWh
$(-19,761.0)
-
MMBtu
TOTAL IMPLEMENTED $107,562 $19,068 $126,085
1,253,810
kWh
$(-18,523.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs