ITAC Assessment: ME0133
ITAC logo
ITAC Assessment: ME0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Tungsten filaments
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 94,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,958 4,550,410
kWh
Fuel Oil #6 $36,698 13,762
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.3212: Optimize plant power factor $2,688 $4,500 $2,688
-
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,453 $6,650 $25,000
268,757
kWh
$(-6,547.0)
-
MMBtu
03 2.5196: Use small number of high output units instead of many small inefficient units $5,276 $7,200 $5,276
68,288
kWh
-
TOTAL RECOMMENDED $26,417 $18,350 $32,964
337,045
kWh
$(-6,547.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs