ITAC Assessment: AS0597
ITAC logo
ITAC Assessment: AS0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Analytical Laboratory Instruments
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 20,622
ft2
Annual Production 25,000
units
Production Hrs. Annual 2,772
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,939 516,298
kWh
Electricity Demand $17,080 2,030
kW-mo/yr
Electricity Fees $5,389 -
Natural Gas $3,385 183
MMBtu
Other Energy $493 1
MMBtu
TOTAL YEARLY COSTS $74,286
RECOMMENDED SAVINGS* $85,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $35,454 $296,882 $33,132
356,640
kWh
$2,322
-
kW-mo/yr
- - - -
02 2.8114: Change rate schedules or other changes in utility service $35,049 $583 - - $35,049 - - -
03 2.8114: Change rate schedules or other changes in utility service $6,087 $583 - - $2,146 - $3,941 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,605 $9,885 $2,779
29,912
kWh
$1,103
-
kW-mo/yr
- - - $723
05 2.7226: Use computer programs to optimize hvac performance $2,499 $3,310 $1,679
18,070
kWh
$726
-
kW-mo/yr
- $94
-
MMBtu
- -
06 2.7144: Install spectral reflectors / delamp $888 $389 $346
3,725
kWh
$135
-
kW-mo/yr
- - - $407
07 2.4231: Reduce the pressure of compressed air to the minimum required $710 $225 $559
6,016
kWh
$151
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $85,292 $311,857 $38,495
414,363
kWh
$4,437
-
kW-mo/yr
$37,195 $94
-
MMBtu
$3,941 $1,130
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs