Assessment Year | 2018 |
---|---|
Principal Product | Animal formula |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
200,000
ft2
|
Annual Production | 2,000,000
ton
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,357 | 772,794 |
kWh
|
$0.060 |
Electricity Demand | $21,302 | 4,169 |
kW-mo/yr
|
$5.11 |
Electricity Fees | $11,643 | - |
|
- |
Natural Gas | $46,388 | 12,557 |
MMBtu
|
$3.69 |
LPG | $111,180 | 8,894 |
MMBtu
|
$12.50 |
TOTAL YEARLY COSTS | $236,870 | |||
RECOMMENDED SAVINGS* | $60,798 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $482 | $40 |
$416
6,927
kWh
|
$66
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,835 | $750 |
$35
580
kWh
|
$2,800
-
kW-mo/yr
|
- | - | - | |
03 | 2.1331: Burn a less expensive grade of fuel | $53,204 | $20,000 | - | - |
$(-16,236.0)
-
MMBtu
|
$55,000
-
MMBtu
|
$14,440 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $158 | $180 |
$133
2,211
kWh
|
$25
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,119 | $7,950 |
$3,690
61,501
kWh
|
$429
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $60,798 | $28,920 |
$4,274
71,219
kWh
|
$3,320
-
kW-mo/yr
|
$(-16,236.0)
-
MMBtu
|
$55,000
-
MMBtu
|
$14,440 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs