Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0180 #02 Y:2003 Turn off equipment when not in use $13,590 -
SU0180 #01 Y:2003 Change rate schedules or other changes in utility service $20,507 -
GT0779 #07 Y:2003 Install occupancy sensors $303 $1,000
GT0779 #06 Y:2003 Reduce illumination to minimum necessary levels $1,561 $320
GT0779 #05 Y:2003 Replace hydraulic / pneumatic equipment with electric equipment $2,090 $4,600
GT0779 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $327 $300
GT0779 #03 Y:2003 Recover waste heat from equipment $2,642 $5,350
GT0779 #02 Y:2003 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $590 $2,700
GT0779 #01 Y:2003 Replace fossil fuel equipment with electrical equipment $1,183 $5,000
UD0690 #12 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $430 $170
UD0690 #11 Y:2003 Check for accuracy of utility / power meters $352 -
UD0690 #10 Y:2003 Standardize motor inventory $952 $340
UD0690 #09 Y:2003 Make a practice of turning off lights when not needed $1,085 $6
UD0690 #08 Y:2003 Make a practice of turning off lights when not needed $1,197 $86
UD0690 #07 Y:2003 Turn off equipment when not in use $1,533 $2,240
UD0690 #06 Y:2003 Reduce the pressure of compressed air to the minimum required $1,580 -
UD0690 #05 Y:2003 Use waste heat from hot flue gases to preheat $1,955 $5,625
UD0690 #04 Y:2003 Reduce fluid flow rates $4,171 $2,400
UD0690 #03 Y:2003 Interlock heating and air conditioning systems to prevent simultaneous operation $4,576 $7,366
UD0690 #02 Y:2003 Install outside air damper / economizer on hvac unit $9,916 $9,244