Assessment Year | 2004 |
---|---|
Principal Product | BOTTLES |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
60,000
ft2
|
Annual Production | 35,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,401 | 2,989,166 |
kWh
|
$0.031 |
Natural Gas | $10,988 | 967 |
MMBtu
|
$11.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,696 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,403 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $1,183 | $5,000 | - | - |
$1,183
-
MMBtu
|
|
02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $590 | $2,700 |
$590
21,752
kWh
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $2,642 | $5,350 |
$(-33.0)
(-1,222)
kWh
|
- |
$2,675
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $327 | $300 |
$327
12,125
kWh
|
- | - | |
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,090 | $4,600 |
$2,090
77,300
kWh
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $1,561 | $320 |
$681
25,196
kWh
|
$880
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $303 | $1,000 |
$303
11,225
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,696 | $19,270 |
$3,958
146,376
kWh
|
$880
-
kW-mo/yr
|
$3,858
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,403 | $9,000 |
$1,220
45,102
kWh
|
- |
$1,183
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs