ITAC Assessment: OK1037
ITAC logo
ITAC Assessment: OK1037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Gray & ductile iron castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 35,000
ft2
Annual Production 1,900,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,761 1,854,700
kWh
Natural Gas $9,567 1,726
MMBtu
Waste Disposal Costs
Water Usage $6,157 1,720
Tgal
TOTAL YEARLY COSTS $197,485
RECOMMENDED SAVINGS* $10,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,395 $2,804 $5,395
55,048
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,825 - $1,825
18,620
kWh
-
03 2.2437: Recover waste heat from equipment $587 $955 - $587
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,155 $4,128 $1,155
11,781
kWh
-
05 2.7261: Install timers and/or thermostats $206 $120 $112
1,140
kWh
$94
-
MMBtu
06 2.6211: Conserve energy by efficient use of vending machines $875 $298 $875
8,930
kWh
-
TOTAL RECOMMENDED $10,043 $8,305 $9,362
95,519
kWh
$681
-
MMBtu
TOTAL IMPLEMENTED $6,756 $7,052 $6,662
67,969
kWh
$94
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs